Space systems. Pressure components and pressure system integration Ingestion-build-48068 which cancels and replaces ISO
$136.00
Description
which cancels and replaces ISO 3951-1:2006 and is a minor revision of that standard with the following changes:
references were updated and the document was editorially revised
As per BS 6349-2
issuance and operation of arrangements for the recognition and acceptance of results produced by bodies undertaking similar conformity assessment and related activities
Reference to the latest version of EN 60068-2-47: Mounting
Space systems. Pressure components and pressure system integration Ingestion-build-48068 which cancels and replaces ISOBS ISO 24638: 2008 Space systems. Pressure components and pressure system integration BS ISO 24638 establishes the baseline requirements for the design, fabrication and testing of space flight pressure components. It also establishes the requirements for assembly, installation, test, inspection, operation and maintenance of the pressure systems in spacecraft and launch vehicles. These requirements, when implemented on a particular space system, ensure
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.